Natural Disasters in Glendale, OH
Hazard risk, disaster history, and FEMA data
Natural Hazard Risk
Source: FEMA National Risk IndexRisk Score
96.3
Relatively High
Expected Annual Loss
96.4
Score (0-100)
Social Vulnerability
43.9
Score (0-100)
Community Resilience
86.3
Score (0-100)
Scores range from 0 (lowest risk) to 100 (highest risk) relative to all U.S. communities. Data from FEMA National Risk Index.
Disaster History & Federal Spending
Source: FEMATotal Declarations
18
Public Assistance
$67.0M
Individual Assistance
$8.9M
Most Common Type
Severe Storm
7 declarations
Public Assistance by Category
PA = FEMA Public Assistance (infrastructure recovery). IA = Individual Assistance (homeowner/renter aid).
Flood Insurance (NFIP)
Source: FEMA NFIPTotal Claims
1,913
Total Claims Paid
$33,514,974
Avg Claim Payout
$17,520
County-level NFIP data from FEMA National Flood Insurance Program.
Hazard Mitigation
Source: FEMA Hazard Mitigation AssistanceMitigation Projects
28
Federal Funding
$18,568,457
Properties Protected
317
Avg Benefit-Cost Ratio
1.53
BCR
Top Mitigation Project Types
| Project Type | Projects | Federal $ |
|---|---|---|
| 200.1: Acquisition of Private Real Property (Structures and Land) - Riverine | 22 | $16,105,728 |
| 91.1: Local Multihazard Mitigation Plan | 4 | $82,121 |
| 403.1: Stormwater Management - Culverts; 500.3: Flood Control - Dam | 1 | $2,358,108 |
| 95.1: FMA or CRS Plan | 1 | $22,500 |
Federally funded projects to reduce future disaster risk. Only includes completed or obligated projects.
Glendale has a relatively high overall natural hazard risk rating according to FEMA's National Risk Index. The top hazard risks are tornado, heat wave, cold wave. The area has had 18 federal disaster declarations. The most common disaster type is severe storm (7 declarations). 1,913 flood insurance claims have been filed in the area. FEMA has obligated $67,019,381 in public assistance recovery funding. $8,856,608 has been distributed in individual assistance to disaster-affected residents. 28 hazard mitigation projects have been funded to reduce future risk.