Natural Disasters in Spokane, MO
Hazard risk, disaster history, and FEMA data
Natural Hazard Risk
Source: FEMA National Risk IndexRisk Score
66.5
Relatively Low
Expected Annual Loss
77.4
Score (0-100)
Social Vulnerability
10.6
Score (0-100)
Community Resilience
52.4
Score (0-100)
Scores range from 0 (lowest risk) to 100 (highest risk) relative to all U.S. communities. Data from FEMA National Risk Index.
Disaster History & Federal Spending
Source: FEMATotal Declarations
22
Public Assistance
$2.9M
Individual Assistance
$414K
Most Common Type
Severe Storm
11 declarations
Showing 20 of 24 disasters
PA = FEMA Public Assistance (infrastructure recovery). IA = Individual Assistance (homeowner/renter aid).
Flood Insurance (NFIP)
Source: FEMA NFIPTotal Claims
77
Total Claims Paid
$2,932,047
Avg Claim Payout
$38,079
County-level NFIP data from FEMA National Flood Insurance Program.
Hazard Mitigation
Source: FEMA Hazard Mitigation AssistanceMitigation Projects
16
Federal Funding
$16,058,788
Properties Protected
14
Avg Benefit-Cost Ratio
2.29
BCR
Top Mitigation Project Types
| Project Type | Projects | Federal $ |
|---|---|---|
| 206.2: Safe Room (Tornado and Severe Wind Shelter) - Public Structures | 14 | $15,029,572 |
| 402.1: Infrastructure Protective Measures (Roads and Bridges) | 1 | $0 |
| 200.1: Acquisition of Private Real Property (Structures and Land) - Riverine | 1 | $1,029,216 |
Federally funded projects to reduce future disaster risk. Only includes completed or obligated projects.
Spokane has a relatively low overall natural hazard risk rating according to FEMA's National Risk Index. The top hazard risks are ice storm, heat wave, tornado. The area has had 22 federal disaster declarations. The most common disaster type is severe storm (11 declarations). 77 flood insurance claims have been filed in the area. FEMA has obligated $2,926,001 in public assistance recovery funding. $413,975 has been distributed in individual assistance to disaster-affected residents. 16 hazard mitigation projects have been funded to reduce future risk.