Natural Disasters in Jones Mills, AR
Hazard risk, disaster history, and FEMA data
Natural Hazard Risk
Source: FEMA National Risk IndexRisk Score
55.5
Relatively Low
Expected Annual Loss
47.1
Score (0-100)
Social Vulnerability
77.4
Score (0-100)
Community Resilience
29.7
Score (0-100)
Scores range from 0 (lowest risk) to 100 (highest risk) relative to all U.S. communities. Data from FEMA National Risk Index.
Disaster History & Federal Spending
Source: FEMATotal Declarations
20
Public Assistance
$2.1M
Individual Assistance
$1.4M
Most Common Type
Severe Storm
8 declarations
Showing 20 of 22 disasters
PA = FEMA Public Assistance (infrastructure recovery). IA = Individual Assistance (homeowner/renter aid).
Flood Insurance (NFIP)
Source: FEMA NFIPTotal Claims
20
Total Claims Paid
$289,527
Avg Claim Payout
$14,476
County-level NFIP data from FEMA National Flood Insurance Program.
Hazard Mitigation
Source: FEMA Hazard Mitigation AssistanceMitigation Projects
9
Federal Funding
$3,513,166
Properties Protected
5
Avg Benefit-Cost Ratio
2.04
BCR
Top Mitigation Project Types
| Project Type | Projects | Federal $ |
|---|---|---|
| 206.2: Safe Room (Tornado and Severe Wind Shelter) - Public Structures | 5 | $3,442,672 |
| Unknown | 1 | $0 |
| 91.1: Local Multihazard Mitigation Plan | 1 | $22,500 |
| 602.1: Other Equipment Purchase and Installation | 1 | $7,994 |
| 403.1: Stormwater Management - Culverts | 1 | $40,000 |
Federally funded projects to reduce future disaster risk. Only includes completed or obligated projects.
Jones Mills has a relatively low overall natural hazard risk rating according to FEMA's National Risk Index. The top hazard risks are ice storm, lightning, strong wind. The area has had 20 federal disaster declarations. The most common disaster type is severe storm (8 declarations). 20 flood insurance claims have been filed in the area. FEMA has obligated $2,119,404 in public assistance recovery funding. $1,381,902 has been distributed in individual assistance to disaster-affected residents. 9 hazard mitigation projects have been funded to reduce future risk.